Monday, 5 September 2011


External Electrical Works
 Engineer's Cost Estimate
(Schedule Items)
Sr.No
Ref: MRS                                                 Item/Page
DESCRIPTION
QUANTITY
UNIT
UNIT RATE
 AMOUNT
 Remarks



(Rs)
 (Rs)

(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
 (9)
 (9)




Section 7:  Telephone System









General









All items of electrical works described under title "Description" unless specifically indicated otherwise, shall be deemed to be read in terms of supply, storing, protecting, making, assembling, installing, applying, laying, fixing, testing, commissioning, clearing etc. of the same inclusive of but not limited to all materials, labour, tools, plants equipments, appliances etc. as required for the completion and maintenance 'of the electrical work as per drawings, specifications, and/or as directed by the Engineer Incharge.















a.



All wiring to be done in PVC conduits  or otherwise specified/appropriate sizes, underground, concealed in walls, columns, ceiling and/or underground wherever required.















b.



All back boxes to be of 16 SWG sheet steel concealed in walls, columns or ceiling with provisions for connection of earth wires, wherever specified.















c.



Install insulated earth conductor of specified size for each lighting and power ccts.















d.



All fan/light points, switches outlets DB's etc. shall be earthed.





e.



All light fixtures shall be as approved by the Engineer..





f.



All material including PVC pipe ,cables, light fixtures and fittings,distribution boards etc should be manufactured/supplied by any one of the manufacturers as mentioned in Annex ''A'' and approved by the Engineer complete in all respects.















IE-1



Supply and erection of PVC pipe for wiring purpose including inspection boxes pull boxes, hooks, bend tees etc. complete recessed in walls





a)
C-24
P-153
i-03-v
40 mm i/d
1000
Rft
      37.00
          37,000

a)
C-24
P-153
i-03-vi
50 mm i/d
500
Rft
      47.45
          23,725





TOTAL



          60,725




Sr.#
FROM TRANSFORMER'S NO
TO                AREA/BUILDING
LOAD IN kw
Current (Amps)
MCCB/MCB
CABLE LENGTH   (Ft.)
CABLE SIZE     (Sq.mm)








(1)
(2)
(6)















1. DB-CAFETERIA
     49.00
        85.00
  100.00
    185.00
 4C-35


2. DB-MOSQUE
     11.00
        19.00
    40.00
    600.00
 4C-25

T-1(100KVA)
 3. MLCP-3
     12.00
        21.00
    40.00
      50.00
 4C-10


FOUNTAIN (FP1-1)(Landscaping Area)
     10.00
        18.00
    40.00
    150.00
 4C-16


 TOTAL
     82.00
 KVA=
  102.50












1. MPB-CINEMA
   175.00
       304.00
  400.00
    200.00
 4C-185


2. DB-COFFEE SHOP
     32.00
        56.00
    63.00
    160.00
 4C-25

T-2(400KVA)
 3. MLCP-4
     20.00
        35.00
    50.00
      35.00
 4C-25


LAKE FOUNTAIN(FP2-1) (150Ft.)
   100.00
       180.00
  300.00
    250.00
 4C-240


 TOTAL
   327.00
 KVA=
  408.75












1. SMPB-Conference Hall
     45.00
        78.00
  150.00
    240.00
 4C-70


2. MPB-Admin Block
     73.00
       127.00
  150.00
    420.00
 4C-50


3. DB- G.T-1
       6.00
        10.00
    40.00
    220.00
 4C-10


4. DB- G.T-2
       6.00
        10.00
    40.00
      70.00
 4C-10

T-3(200KVA)
 3. MLCP-5
     12.00
        21.00
    40.00
    140.00
 4C-10


FOUNTAIN(FP3-1) (Kidney Shape)
     15.00
        25.00
    60.00
    350.00
 4C-16


 TOTAL
   157.00
 KVA=
  196.25











T-4(1250KVA)
 For HVAC Load
   732.00
    1,274.00
         -  
           -  
 11-KV XLPE


 TOTAL
   732.00
 KVA=
  915.00

 3C-70










1. SMPB-PIAZZA
     39.00
        67.00
  100.00
    195.00
 4C-25


2. SMPB-AMPHI THEATRE
     56.00
        98.00
  150.00
    260.00
 4C-50

T-5(200KVA)
 3. MLCP-1
     14.00
        25.00
    40.00
      20.00
 4C-10


 TOTAL
   109.00
 KVA=
  136.25












1. MPB-AUDITORIUM
   200.00
       350.00
  500.00
    100.00
 4C-240


2. MLCP-2
     12.00
        21.00
    40.00
    200.00
 4C-16

T-6(630KVA)
 LAKE FOUNTAIN(FP6-2) (150Ft.)
   100.00
       174.00
  300.00
    300.00
 4C-240


Stone Fountain(FP6-1)
     10.00
        18.00
    40.00
    500.00
 4C-16


 TOTAL
   322.00
 KVA=
  402.50












1. LP/-1/1
       7.00
        12.00
    30.00
    140.00
 4C-6

MLCP-1   (40Amp)
2..SLP-1/1
       7.00
        12.00
    30.00
      30.00
 4C-6


 TOTAL
     14.00
 KVA=
    17.50












1. LP/-2/1
       7.00
        12.00
    30.00
    170.00
 4C-6

MLCP-2   (40Amp)
2..SLP-2/1
       5.00
          9.00
    30.00
      30.00
 4C-6


 TOTAL
     12.00
 KVA=
    15.00












1. LP/-3/1
       9.00
        16.00
    30.00
    145.00
 4C-6

MLCP-3   (40Amp)
2..SLP-3/1
       2.00
          4.00
    30.00
    450.00
 4C-6


 TOTAL
     11.00
 KVA=
    13.75












1. LP/-4/1
       9.00
        16.00
    30.00
    150.00
 4C-10

MLCP-4   (40Amp)








 TOTAL
       9.00
 KVA=
    11.25












1. LP/-5/1
       6.00
        10.00
    30.00
    190.00
 4C-6

MLCP-5   (40Amp)
2..SLP-5/1
       4.00
          7.00
    30.00
    215.00
 4C-6


 TOTAL
     10.00
 KVA=
    12.50